The Pink Report is an executive summary of the project to date that provides critical schedule information in order to have conversations with stakeholders.
The Pink Report includes:
- All Schedule Quality Issues
- A Summary Progress Graphic
- A Copy of the Delay Table
- All Critical Changes in the Audit Log
Follow these steps to generate The Pink Report:
- Click the Pink Report button on the dashboard to activate the Pink Report Creation menu
- Select Schedule Update: Select from which schedule update the graphic will be based on
- Select WBS Level to Group From/To: Select the range of WBS Levels the summary bars in the summary graphic will be generated via. Note, the maximum selectable range is 1 level apart. Jump to Section 4 for more WBS info
- Click “Print”